Total Length: 750 words ( 3 double-spaced pages)
Total Sources: 2
Page 1 of 3
References
Six Sigma Material (2017). Control: the final phase of a DMAIC project. Six Sigma Material. Retrieved April 15, 2017 from http://www.six-sigma-material.com/Control.html
Weisenfelder, H. (2013) DMAIC Phase 5: Control. Bright Hub Project Management. Retrieved April 15, 2017 from http://www.brighthubpm.com/six-sigma/27134-dmaic-phase-five-the-control-phase/
Latest APA Format (6th edition)
Copy Reference
"Six Sigma DMAIC 5 Control For Starbucks" (2017, April 15) Retrieved April 26, 2024, from
https://www.aceyourpaper.com/essays/six-sigma-dmaic-5-control-starbucks-essay
Latest MLA Format (8th edition)
Copy Reference
"Six Sigma DMAIC 5 Control For Starbucks" 15 April 2017. Web.26 April. 2024. <
https://www.aceyourpaper.com/essays/six-sigma-dmaic-5-control-starbucks-essay>
Latest Chicago Format (16th edition)
Copy Reference
"Six Sigma DMAIC 5 Control For Starbucks", 15 April 2017, Accessed.26 April. 2024,
https://www.aceyourpaper.com/essays/six-sigma-dmaic-5-control-starbucks-essay