Building Survey Australian Standards of Assessment Essay

Total Length: 1584 words ( 5 double-spaced pages)

Total Sources: 5

Page 1 of 5

Building Surveying AssessmentTask 1: Planning Application requirements George Rivers Councila. All documents needed to achieve satisfactory planning-approval submission for a three-storey home and whether or not the venture would acquire council approval.Development Application lodgment requirementsApplication forms (Hard copies accepted)· Complete Development Application· Consent of the owner on a separate letter or formPlans- PDF (All new additions colored)· Survey Plan (needed in case of every new structure and any additions or extensions made to extant structures)· Site Analysis Plan· Site Plan (All applications) – Needs to display site area, size, north point, extant vegetation, structures’ locations and their distance from the boundaries, and adjacent plots’ building locations· Elevations (Fresh external modifications and developments) that explicitly display individual floor, roof and ceiling levels’ heights, besides extant and planned ground levels· Sections (Every fresh external modification and development)· Floor Plans (Every fresh development. In case of additions and modifications, there is a need to submit extant as well as planned floor plans). Floor plans must cover individual rooms’ use, levels and layout to AHD· Elevational Shadows and Shadow Diagrams (all developments of a minimum of two floors)· Landscape Plan displaying deep soil areas and pervious and impervious areas; this includes all retaining structures or walls· Schedule of finishes and colors· Storm water management report or calculator, checklist and storm water concept planDesign Review Panel Package (SEPP 65 Applications) – 3 additional hard copies· SEPP 65- Registered Architect-prepared Design Verification Statement· Environmental Effects Statement· Whole Set of landscaping and architectural plans (A3 size)Supporting Documentation- Electronic PDF copies· BASIX Certificate· Environmental Effects Statement· Report on Acid Sulphate Soils· Waste Management Plan· Conservation management plan and Statement on Heritage Impact (Georges River Council n.da)The present three-storey structure venture possesses most of the vital documentation needed as per George River Council planning application requirements. But it fails to entirely meet the requirements outlined in the council’s lodgment checklist for development applications. Further, the following key documents needed in case of new residences are missing - a Waste Management Plan and an Acid Sulphate Soils Report. Thus, the application in its existing state will probably not acquire council approval.b. Compliance with statutory requirementsThe Australian statutory requirements applicable to a three-storey building’s construction include; the Building Code of Australia, the 1975 Building Act, the Queensland Development Code, and the 2006 building regulation. Up until now, the documents presented adhere to the legal prerequisites for the edifice’s particular class. But a few remain to be presented, such as documentation detailing the techniques for conducting the planned construction work; this includes a working plan outlined within AS 2601, required for building demolition. In case of the site in question, two detached structures – a brick garage and a weatherboard cottage need to be demolished. Thus, there is a need for a demolition plan.c. Is the council asking for more documentation than is required by legislation?No, according to legislation, only the following are needed: no less than 3 copies of; details on the surroundings, site plan, extra plans, and details on the planned development.

Stuck Writing Your "Building Survey Australian Standards of Assessment" Essay?

Besides these requirements, local and state governments and councils can incorporate more planning instruments for altering the nature of assessment needed for particular kinds of development.d.…

[…… parts of this paper are missing, click here to view the entire document ]

…the term ‘near’ explicitly. Consider trees’ different breast sizes and kind, besides prevalent environmental conditions, it would have been prudent to specify measurements with regard to how near excavations may be conducted. Hence, the report may be concluded to have been formulated by an inexperienced person not adequately familiar with the standard.Task 4: Consent/approval documentConditions required for the permit/approval· Storm Water Management report/calculator, checklist and concept plan. The report needs to explicitly state where storm water will be discharged. In case of plans to link to extant systems, plans need to specify the location of the extant system and where the water drains to. Present documentation fails to display details on storm water management on the site.· ASS Report must be composed and presented by a specialist and must indicate the interaction between the class 5 acid sulphate soil and the building venture.· A demolition waste management plan, besides that on management of waste produced due to continued usage of the structure ought to be offered for project approval, according to the requirements stipulated by George River Council.Task 5: Legal requirements for application notification when it is being assessed for approval1. Presenting an application notice to occupiers or landowners of:· All adjacent properties (which covers lands across a reserve or road up to 60m from the site) (The Act’s Section 4 offers a more detailed explanation of what ‘adjacent land’ implies)· Other plots within the locality that, according to relevant authorities, would be impacted directly and significantly by the construction project.1. A notice issued at least once within a newspaper widely read in the locality….....

Show More ⇣


     Open the full completed essay and source list


OR

     Order a one-of-a-kind custom essay on this topic


sample essay writing service

Cite This Resource:

Latest APA Format (6th edition)

Copy Reference
"Building Survey Australian Standards Of Assessment" (2018, April 29) Retrieved July 6, 2024, from
https://www.aceyourpaper.com/essays/building-survey-australian-standards-assessment-2177705

Latest MLA Format (8th edition)

Copy Reference
"Building Survey Australian Standards Of Assessment" 29 April 2018. Web.6 July. 2024. <
https://www.aceyourpaper.com/essays/building-survey-australian-standards-assessment-2177705>

Latest Chicago Format (16th edition)

Copy Reference
"Building Survey Australian Standards Of Assessment", 29 April 2018, Accessed.6 July. 2024,
https://www.aceyourpaper.com/essays/building-survey-australian-standards-assessment-2177705